Bathroom waterproofing: where the membrane goes and what to check
Bathroom waterproofing is a continuous liquid or sheet membrane under the tile adhesive, because water gets through the grout between the tiles. It covers the whole floor and the foot of the walls, plus every wall the shower wets; the corners, pipes and floor drain are sealed, since leaks usually start there.
Waterproofing under tiles: what it is and why tiles are not enough
Waterproofing is a thin, continuous layer between the base (screed, concrete or wall board) and the tile adhesive. Tiles themselves barely absorb water, but cement grout soaks it up and fine cracks open in it over time, so without a membrane water eventually reaches the floor and walls.
Both common kinds of membrane are reliable only with the same system’s primer, tapes and pipe collars, and with a tile adhesive the system approves.
- Liquid membrane: brushed or rolled on in coats and easy around corners and pipes, but its thickness depends on the worker, so the product’s stated amount per square metre must be used.
- Sheet membrane: bonded with the system’s adhesive and even in thickness, but every joint and corner needs an overlap or a sealed strip.
Where does waterproofing go in a bathroom and a shower?
Shower waterproofing alone is not enough: water spreads across the room, so the whole floor and every wall that gets wet are waterproofed. The design or the system’s instructions set the exact heights, which we agree with you before work starts.
- Floor: all of it, including under the bath or shower tray, with an upstand onto the walls, usually 15 to 20 cm high.
- Shower walls: at least to shower-head height and a little above; in a shower without a tray it often goes up to the ceiling.
- Around the bath: from the floor to just above the rim, or to shower height with a shower over the bath.
- Behind the basin and a wall-hung WC frame: each pipe through the wall gets a sealing collar, and the board around it is waterproofed.
Where waterproofing fails: corners, pipes and the drain
A membrane rarely fails mid-wall. Leaks start at junctions, around pipes and on a base that moves or softens when wet.
- Corners and wall-floor junctions without reinforcing tape: the joint moves slightly and the membrane cracks along it.
- Pipes without sealing collars: water runs along the pipe into the wall.
- A drain or linear channel whose flange is not bonded into the membrane: water runs between the drain and the floor.
- No proper slope to the drain: water stands and soaks the grout. The slope, usually 1 to 2 cm per metre, belongs in the screed, not the tile adhesive.
- A base unfit for a wet area: a timber floor that flexes underfoot, or ordinary plasterboard in the shower instead of moisture-resistant or cement board.
- Silicone instead of a membrane: the joint along the bath needs renewing every few years and cannot keep water out of the wall.

Renovating a bathroom? We can waterproof and tile it
Call us or send photos of the bathroom with a short description of the work, and we will arrange a site visit and prepare an estimate that includes the waterproofing.
Order of work: primer, tape, two coats and a check before tiling
The membrane goes on a firm, clean, dry base in a set order and is checked before tile adhesive hides it for good. Photograph the corners, pipes and drain: after tiling, only photos and a signed record of hidden work, if the contract has one, show how it was done.
- Base and primer: the slope to the drain formed and the dust removed, then the system’s primer, dried as instructed.
- Tape, collars and the drain flange: set into the first coat at every corner, junction and pipe.
- Coats: usually two, the second once the first is dry, until the product’s required thickness is reached.
- Drying: as long as the product’s instructions require before tiling.
- Check: thin spots, pinholes and lifted tape are fixed before tiling. Where the floor allows, a flood test helps once the membrane has fully cured as the product requires: with the drain plugged, a few centimetres of water, kept below the upstands and the threshold, is left for a day or more while the level and the ceiling below are watched.
Waterproofing a bathroom in an apartment building
In an apartment a leak often shows only on the neighbours’ ceiling, sometimes long after the renovation, so the flood test matters even more.
Moving the drain, the WC or the whole bathroom usually means new waste pipes to the riser, the shared vertical pipe through every floor. Work on the riser and shutting off its water are agreed with the management company in advance, so ask them first what the building’s rules allow and whether the other owners must agree. If the bathroom moves elsewhere, ask your būvvalde (the municipal building authority) which document is needed; it usually goes through BIS, the Construction Information System. Above the neighbours’ living rooms, the building code LBN 200-21 allows a bathroom only when sound insulation, waterproofing and other requirements are met.
Who does bathroom waterproofing and how to order it
In Riga we can waterproof your bathroom as part of a bathroom-only or whole-apartment renovation. We look at the room first and agree the scope and estimate with you before work starts.
One team sees the job through, from stripping the old tiles to the finished bathroom, and plumbers we bring in work to the same schedule.