Floor insulation: concrete on the ground, timber joists or a basement below
Floor insulation is a layer of rigid boards or mineral wool that stops a room losing heat downwards, and where it goes depends on what is under the floor: under the screed of a floor on the ground, between timber joists, or on the ceiling of a cold basement.
Floor insulation depends on the floor: which one do you have?
A house usually has one of three kinds of floor, each insulated in its own way.
- Concrete floor on the ground: a slab on compacted sand or gravel, usual in newer houses, insulated under the slab when it is built, or under a new screed (the levelling layer of sand and cement) in a renovation.
- Timber floor over a crawl space: floorboards on joists above a ventilated void, common in older and wooden houses, insulated between the joists.
- Floor over an unheated basement: usually insulated on the basement ceiling.
- Not sure which you have: small vents low in the outer walls usually mean a crawl space; lift a floorboard to be sure.
How to insulate a concrete floor on the ground
A concrete floor on the ground is insulated with rigid polystyrene boards, expanded (EPS) or extruded (XPS), laid on a damp-proof membrane under a new screed; soft mineral wool would compress.
From the bottom up: the slab, the membrane, the boards with staggered joints, a film that keeps the wet screed out of the joints, then the screed. XPS absorbs less water and takes more load, so it is often chosen under a slab on the ground and at its edges, though EPS of a suitable strength grade is common there too; floor-grade EPS is usual under a screed.
An edge strip of soft insulation runs along every wall so the screed can expand without cracking.
In a renovation, height is the problem: either the old floor is broken out and the base lowered, or thresholds, doors and bathroom drains are raised to match.
Insulating a timber floor: between the joists, from above or below
In a timber floor, mineral wool or wood fibre fills the gaps between the joists. Boards or battens fixed under or along the joists hold it up; a breathable wind barrier goes on the cold side, and an airtight vapour control layer on the warm side, under the floorboards.
Lift a few boards by the outer walls first to check the joist ends and the sill beam they rest on: rot is repaired before insulation covers it. Owners sometimes block the vents against the cold, but the vents must stay open to keep the joists dry, and the wind barrier stops the draught.
- From above: every joist is in view and each layer fits properly, but the room is out of use and old boards may split.
- From below: the room stays in use, but the work is done lying in the crawl space, which must be high enough, and no vapour control layer can go on the warm side. So it suits floors whose boarding is already fairly airtight, such as tongue-and-groove boards under a continuous covering; gaps between old boards are sealed from above first.
Renovating a floor? We can check the base and lay flooring
Call us or send a request with a few photos of the floor and a short description, and we will arrange a site visit and prepare an estimate for the floor work.
Insulating a floor over a basement from below
Over an unheated basement, it is usually simplest to insulate its ceiling and leave the rooms above untouched: rigid boards glued and anchored to concrete, or insulation between timber joists, covered with boards.
Dry out a damp basement first and check the headroom. The basement gets colder afterwards, so its water and heating pipes need insulating. The fire safety code LBN 201-15 “Būvju ugunsdrošība” and the design decide whether polystyrene on the ceiling needs a fire-resistant covering; non-combustible stone wool boards are often chosen there instead.
In an apartment building the basement is shared property, so the owners decide together. Ask your būvvalde, the municipal building authority, which document is needed; it usually goes through BIS, the Construction Information System.
Underfloor heating and a new screed: what to check before laying the flooring
Underfloor heating needs insulation under the pipes so the heat goes up into the room. The pipes are pressure-tested before they are cast into the screed and usually kept under pressure while it is laid.
Timber, laminate, vinyl or glued parquet laid on a damp screed can swell, warp or come loose. A new screed can take weeks or longer to dry, so it is first tested for moisture as the flooring manufacturer specifies. A heated screed is usually warmed up gradually following a set programme, and not before it has cured for the time its maker gives; heating it quickly can crack it.

Who can renovate your floor and how to order the work
What Else can renovate your floor as part of an interior renovation, which we carry out across Latvia, or an apartment renovation in Riga. We remove the old covering, level the floor and lay the new flooring on the prepared base.
At the inspection we check the floor base, and before work starts we agree the scope and the estimate with you. One team runs the job to the finish; plumbing, heating and electrics are done by specialists we bring in.